TSX.V: PGZ
OTCQB: PGZFF
FRA: 2EU

Escacena Project

ESCACENA PROJECT (100% OWNED)
PROJECT OVERVIEW

Escacena Project (100%-Owned)

KEY POINTS 

  • 15 large untested drill targets
  • District-scale resource potential
  • Plan includes up to two drill rigs at Escacena
  • Exploration advancing and continual prioritizing new drill targets

Pan Global's Escacena Project comprises a significant land package covering more than 13,000 hectares, immediately neighbors the Aznalcóllar and Los Frailes projects being developed by Grupo México, and is 12km to the west of Resource Capital Fund’s Cobre Las Cruces Mine. Atalaya’s operating Riotinto Mine is 23km to the northwest. At Escacena, the 2026 drill program aims to grow the copper resource base with new discoveries at the target-rich Project. The Escacena Project includes Mineral Resource Estimates at the La Romana copper-tin-silver and Cañada Honda copper-gold deposits, and hosts 15 other prospective targets for follow-up.

The 2026 drill program aims to grow Pan Global’s copper resource base through targeted, high-confidence exploration drilling to discover new mineralization. Up to 15 untested targets have been identified for follow-up, with drilling also planned at the Cortijo target at Escacena North and the Trinidad and Carmen targets on the newly awarded Escacena South property. Drilling will also test for extensions to the La Romana (copper-tin-silver) and Cañada Honda (copper-gold) deposits.

Escacena Project Maiden Mineral Resource Estimates

La Romana

Measured and Indicated: 32.4 Mt at 0.37% Cu, 270 ppm Sn, 1.7 g/t Ag, 0.44% CuEq (119.5 kt Cu, 8.8 kt Sn, 1.7 Moz Ag) – at 0.2 % copper cutoff grade, and

Inferred: 4.0 Mt at 0.40% Cu, 71 ppm Sn, 1.4 g/t Ag; 0.42% CuEq (15.8 kt Cu, 0.3 kt Sn, 0.2 Moz Ag) – at 0.2% copper cutoff grade.

Cañada Honda

Inferred: 5.0 Mt at 0.65 g/t Au, 0.14% Cu, 1.2 g/t Ag; 0.74 g/t AuEq (104 koz Au, 6.8 kt Cu, 0.2 Moz Ag) – at 0.25 g/t gold cutoff grade.

For details and additional technical disclosure, please see the Technical Reports section of the Escacena Project page as well as all filings made to the Company profile on SEDAR+.  

In March 2024, Pan Global released the second phase of copper metallurgy results for La Romana, indicating excellent recoveries of 88% copper and concentrate grades of up to 32.5% copper, with payable silver content and low deleterious elements. The positive results advanced La Romana to the preliminary design phase of the metallurgical process. In April 2024, the Company reported positive tin metallurgy results for La Romana, concluding that the deposit mineralization is amenable to producing high-quality tin concentrate using conventional gravity separation. Tin concentrate grades of 63.2% tin and 58.1% recovery were achieved. The outstanding copper and tin metallurgy test results are an important de-risking milestone for the La Romana deposit.

BEST IN IBERIAN PYRITE BELT METALLURGICAL RESULTS 

REFERENCES: 

Atalaya Mining plc

2022-09-16 – “Technical Report on the Riotinto Copper Project” Submitted date: 2022-10-05 Source: SEDAR
2023-03-27 –“Preliminary Economic Assessment. Proyecto Riotinto, Huevla Province, Spain” Effective date: October 31, 2022. Issue date: February 21,2023. Submitted date: 2022-10-05 Source: SEDAR+
Lundin Mining Corporation
2023-02-23 – “NI 43-101 Technical Report on the Neves-Corvo Mine, Portugal” Source: SEDAR+
Emerita Resources Corporation
2025-04-30– “NI 43-101 Technical Report on the Iberian Belt West Project, Spain” Dated April 30, 2025. Source: SEDAR+
Denarius Metals Corp.
2023-11-02 – “NI 43-101 Technical Report Mineral Resource Estimate for Lomero Poyatos, Andalucía, Spain” Effective date: July 19, 2022 Filing date: November 2, 2022 Source: SEDAR+
2024-05-23 – “Technical Report and Preliminary Feasibility Study for the Aguablanca Nickel-Copper Mineral Deposit” Effective date: March 24, 2024Filing date: May 23, 2024Source:SEDAR+
Cerrado Gold
2023-08-01 – “NI 43-101 Technical Report and DFS for the Lagoa Salgada Project, Setúbal District, Portugal” Effective date: July 24, 2023 Filing date: August 1, 2023Source:SEDAR+
First Quantum Minerals Ltd.
2024-02-20 – “Cobre Las Cruces: Polymetallic Primary Sulphide Project, Andalucía, Spain NI43-101 Technical Report ”Effective date: February20, 2024 Filing date: February20, 2024 Source: SEDAR+
Sandfire MATSA
2022-06 MATSA Copper Operations Site Tour Information Pack. https://www.sandfire.com.au/wp-content/uploads/2022/07/MATSA-Site-Tour-Presentation-June-2022.pdf
2022-07-28 June 2022 Quarterly Report and Presentation ASX Release: Updated Measured, Indicated and Inferred Mineral Resource Estimate completed for the MATSA Copper Operations. https://www.sandfire.com.au/wp-content/uploads/2023/03/SandfireJune2022QuarterlyReport.pdf
2024-07-10 – “MATSA Mineral Resource and Ore Reserve update,re-released”Distributed:July10, 2024
https://sfr.live.irmau.com/site/pdf/45bc4690-d0f4-401f-b00c-4afd3ee4add0/MATSA-Mineral-Resource-and-Ore-Reserve-Update-Rereleased.pdf  
Grupo México
2018-02 – “Mina Los Frailes.Proyecto de Explotación” https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/227920.html

RARE HIGHLY PROSPECTIVE GREENFIELD PROJECT IN A WELL-DEVELOPED DISTRICT 

In June 2023, the discovery holes at the Cañada Honda copper-gold deposit were announced and subsequent drillholes have expanded on the results, indicating an upper gold zone and deeper zone of copper-gold mineralization at the edge of a large untested DHEM conductor anomaly. The Downhole Electromagnetic (DHEM) conductor and adjacent 3km-long gravity anomaly expands the size potential at Cañada Honda significantly. Cañada Honda has consistently produced drillhole assay results with the highest gold grades detected in the Escacena Project area to date, a potentially significant addition to the copper equivalent grade.

The Los Frailes Mine adjacent to the Escacena Project received notice of its Unified Environmental Authorization in July 2024; On May 30, 2025 the Mine received its exploitation permit approving the start of construction and pre-development work including construction of a water treatment facility. Construction and mine development is expected to take up to three years. The €450 million project includes a new processing facility and is expected to create about 2,000 direct and indirect jobs with an initial resource of 45 million tons of copper, zinc, and lead with an initial mine life of 17 years.

A map of the united statesAI-generated content may be incorrect.

La Romana Discovery – rare copper-tin-silver deposit in the Iberian Pyrite Belt

Current: 

  • 192 drillholes drilled and reported to date, 99% hit rate for mineralization 
  • 1.7km surface strike extent of copper-tin-silver deposit  
  • Maiden NI 43-101 Mineral Resource Estimate for La Romana deposit announced on December 31, 2025
  • Surrounded by four mines held by major mining companies, including Grupo México’s Los Frailes Mine that received its exploitation permit on May 30, 2025 to begin development and construction 
  • In March 2024, Pan Global released the second phase of copper metallurgy results for La Romana, indicating excellent recoveries of 88% copper and concentrate grades of up to 32.5% copper – the highest in the Iberian Pyrite Belt and with low levels of deleterious elements 
  • In December 2024, the Company released Phase Two tin metallurgy with high concentrate grades of 63.2% at recovery rates of 64% calculated from conventional gravity processing and with low levels of deleterious elements

History: 

  • Project acquired by current management via long-term relationships in Spain and history of success acquiring, exploring, and discovering economic deposits in the Iberian Pyrite Belt 
  • Drilling and geophysics as well as Induced Polarization (IP) are coincident in La Romana target and at the Escacena Project generally 
  • Initial geophysics reported in June 2019. Drilling at La Romana and Cañada Honda targets commenced in late July 2019
  • Initial indications of mineralization found using downhole electromagnetics reported in early October 2019 and the discovery hole at La Romana (LRD-02) reporting 20.5 meters of 1.5% cueq of near-surface mineralization later in October 2019. 
  • In November 2021, Pan Global was granted a permit by the regional government of Andalucia for exploration of the Al Andaluz property. Al Andaluz is located immediately adjacent to the Company’s initial holdings and represents a 115% increase to the exploration area, adding approximately 2,365 hectares to the Escacena Project area
  • An additional 1,030 hectares remain under application
  • Al Andaluz comes to within 600 meters of the edge of the Aznalcóllar mine and approximately 12 km west of the Las Cruces copper mine

Cañada Honda Discovery – a gold-copper discovery where we've just scratched the surface of a 3km target 

Current: 

  • 16 holes drilled in total at target, with drilling in 2023-2024 confirming the down-dip continuation of copper and gold mineralization and expanding the surface extent to more than 450m x 450m 
  • All drilling to-date is at the eastern end of a very large, mostly untested, 3km east-west, coincident gravity and heliborne electro-magnetic (“HEM”) target
  • Inferred gold-copper resource announced effective December 31, 2025

In June 2023, the discovery holes at the Cañada Honda copper-gold deposit were announced and subsequent drillholes have expanded on the results, indicating an upper gold zone and deeper zone of copper-gold mineralization at the edge of a large untested DHEM conductor anomaly. The Downhole Electromagnetic (DHEM) conductor and adjacent 3km-long gravity anomaly expands the size potential at Cañada Honda significantly. Cañada Honda has consistently produced drillhole assay results with the highest gold grades detected in the Escacena Project area to date, a potentially significant addition to the copper equivalent grade.

Álvaro Merino P.Geo., Pan Global’s Vice President, Exploration, and a qualified person as defined by National Instrument 43-101, has reviewed the technical information that forms the basis for this webpage.

No items found.
Join our
newsfeed
Join our newsletter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Suite 1150 - 355 Burrard St.
Vancouver BC V6C 2G8
Canada
@ 2025 Pan Global Resources.
All rights reserved
Powered By Duetto